Calculation methodology

The formulas, constants and rounding rules behind the tools that are live today.

General principles

  • Full precision internally; rounding happens only for display (up to 6 significant digits for conversions, cents for money).
  • Every value is shown with its unit.
  • Inputs are validated; impossible values show an error instead of a result.
  • Calculations run in your browser. Results do not depend on a server.

Unit conversions

Each unit is converted through an SI base unit using exact defined factors:

UnitDefinition
inch0.0254 m (exact)
foot0.3048 m (exact)
mile1,609.344 m (exact)
pound (avoirdupois)0.45359237 kg (exact)
ounce1/16 lb = 28.349523125 g
US gallon3.785411784 L (exact)
US fluid ounce1/128 US gal ≈ 29.5735 mL
US cup8 US fl oz ≈ 236.5882 mL
acre4,046.8564224 m² (43,560 ft²)
psi6,894.757293168 Pa
pound-foot1.3558179483 N·m
average month30.436875 days (365.2425 ÷ 12)

Temperature: °F = °C × 9/5 + 32; K = °C + 273.15.

Date arithmetic

Dates are calculated in UTC calendar days so daylight-saving changes never shift a result. Adding months keeps the day of the month, or uses the month’s last day when that day doesn’t exist. Business days skip Saturdays and Sundays; public holidays are not yet excluded. Week numbers follow ISO 8601.

Concrete volume

Slab: V = length × width × thickness Column: V = π × (diameter ÷ 2)² × height Tube: V = π × ((outer ÷ 2)² − (inner ÷ 2)²) × height Order: V × quantity × (1 + waste %)

Bag counts use typical printed yields of US pre-mix bags (40 lb ≈ 0.30 ft³, 60 lb ≈ 0.45 ft³, 80 lb ≈ 0.60 ft³) and always round up. Weight uses 150 lb/ft³, a common planning value for normal-weight concrete.

Loan amortization

M = P × r × (1 + r)ⁿ ÷ ((1 + r)ⁿ − 1) r = annual rate ÷ 12, n = number of monthly payments

Interest is computed monthly on the remaining balance and rounded to the cent. The final payment is adjusted so the balance reaches exactly $0. A 0% rate gives M = P ÷ n.

Testing

Live formulas have automated tests with known answers (nearly 500 checks run before every release), for example 90 days after 30 Oct 2026 is 28 Jan 2027, a 10 × 10 ft × 4 in slab is 1.2346 yd³, and 1 acre is 43,560 ft².